Skip to main content

Replacement of robotised underbody production line


One of the biggest automobile manufacturers trusted us with the replacement of an underbody line including fourteen pieces of robots and ten pieces of robot bases at a welding shop in Czech.

The replacement project included electrical and mechanical dismantling, relocation of new robots in place of existing ones, connection of services and exhaust system. Some of the equipment used for the project were:

  • 1x FLT Hyster 5.5t electrical
  • 1x FLT VersaLift 40/60 with crane jib
  • 1x FLT Hyster 7.0 with a crane jib

The main challenge of this project was lifting and moving the robots over fences and some other components which required very precise work. A total of 24 operatives and 940 project hours were utilised to complete the project on time and with 100% satisfaction from the client. Safety was our main concern, and careful strategic planning was essential to ensure the work was completed safely.

Beck & Pollitzer has a proven track record of carrying out major relocation and installation projects across the globe within the automotive sector. This is backed up by our 150+ years of experience and 30+ locations worldwide. Contact us and discuss your next project!


    Copyright © Beck & Pollitzer Ltd. All Rights Reserved.