Blue-Chip Client Chooses Beck & Pollitzer for Flawless Disassembly & Relocation

Beck & Pollitzer recently tackled a complex project for a renowned European blue-chip client, showcasing our expertise in minimizing production downtime while seamlessly disassembling and relocating critical infrastructure.

The challenge – Dismantling and relocating two entire fridge production lines, with one set requiring meticulous disassembly for reassembly at a new site.

Phase 1: Surgical precision in a live environment

Our team began by scrapping the second production line responsibly, maximising material recovery through efficient recycling processes. Simultaneously, we embarked on the delicate task of disassembling four key machines: a packaging machine, vacuum forming machine, door foaming machine, and pre-assembly line. Every step was meticulously documented, with electrical disconnection sheets, detailed diagrams, and even GoPro footage captured to ensure seamless reassembly at the new location.

Disassembled machinery:

  • 1x Packaging machine
  • 1x Vacuum forming machine
  • 1x Door foaming machine
  • 1x Pre-assembly line
  • 1x Assembly line
  • 1x Packing line
  • 1x Foaming machine
  • 1x Sheet metal forming machine
  • 1x Laser cutting machine
  • 1x Puffer lift

Phase 2: International collaboration ensures smooth transitions

Collaboration played a vital role in this project’s success. We worked closely with the receiving country to develop a standardized marking and documentation system, guaranteeing the foaming machine’s accurate reconstruction abroad.

Phase 3: Minimizing disruption while maximizing efficiency

With the first production line located adjacent to active production areas, meticulous planning and strict safety protocols were paramount. Our team employed strategic logistics to minimize any disruption to the client’s ongoing operations. The successful deployment of 42 vehicles further demonstrates our ability to handle large-scale equipment movements with precision and efficiency.

Results:

Beck & Pollitzer successfully completed the disassembly and relocation of two fridge production lines within a 3-month timeframe, exceeding the client’s expectations. We delivered a sustainable machinery moving solution through responsible recycling, preserved operational continuity through meticulous planning, and fostered successful international collaboration.

Looking for a trusted partner to handle your complex industrial relocation needs? Contact Beck & Pollitzer today and experience the difference!

Beck & Pollitzer Czech was awarded a new relocation project by a major manufacturer of electrical installation equipment.  We acted as the main contractor to relocate twelve Injection Molding Machines (IMMs) and three Computer Numerical Contro…
Beck & Pollitzer undertook another warehouse automation project for a dairy producer, which was completed successfully on time. The task included the installation of a fully automated warehouse system, which will operate at a very low temperat…
At the end of 2022, Beck & Pollitzer Czech installed a spray packaging production line for a major packaging industry client. Some of the tasks which were undertaken by our experienced team in the Czech for this installation project were: Hea…
In a recent project within the automotive and industrial manufacturing sector, a major relocation was successfully executed, involving the transfer of two critical fuel injection pump production lines. This intricate operation required the movemen…
Our client, a European automotive battery leader, sought to establish a state-of-the-art battery cell plant in France to decarbonize automotive battery production. They required a partner capable of handling the complex electrical integration and …