Skip to main content

Latest News

Production line transfer


Between Rosiéres (France) and Eskisehir (Turkey) lie two-thousand miles of terrain over which Beck & Pollitzer will complete their most recent project – the transportation and installation of a white goods production line. Another excellent example of collaboration between two Beck & Pollitzer Business Units – France and Turkey this time.

The usual challenges, such as technical operations for unloading and dismantling machinery and working in tight spaces, were present. However, these were further amplified by the pandemic that has recently swept the globe, leaving no commercial business untouched.

Nevertheless, thanks to the vigilance and trailblazing attitude towards Health and Safety that define the ethos of Beck & Pollitzer, the relocation was carried out safely, with masks and social distancing at all times.

The logistical challenge was overcome through excellent communication between the two Beck & Pollitzer business units.
Another chapter in the long story of successful transfers and installations by Beck & Pollitzer!

Challenge: A global leader in electrical and electronic safety components needed a reliable partner for the mechanical installation of a massive HOP 1000t press. Having successfully installed a previous press for the same client in 2019, Beck &amp…
Our client, a European automotive battery leader, sought to establish a state-of-the-art battery cell plant in France to decarbonise automotive battery production. They required a partner capable of handling the complex electrical integration and …
We are thrilled to announce that EcoVadis has assessed Beck & Pollitzer as being in the top 15% of companies worldwide for its social and environmental performance. This upgrade from Bronze to Silver, reflects our ongoing commitment to sustain…
In a recent project within the automotive and industrial manufacturing sector, a major relocation was successfully executed, involving the transfer of two critical fuel injection pump production lines. This intricate operation required the movemen…
Beck & Pollitzer France successfully executed a complex machinery installation project for a leading Japanese multinational pharmaceutical company in Belgium. The 16-month project, initiated in 2023, required a substantial investment of over 1…