A long term client needed to move a complete production line from Bulgaria to the Netherlands and naturally turned to the Beck & Pollitzer team in the Czech Republic to execute this demanding project. The project consists of dismantling and loading of two complete casting and rolling lines in Bulgaria, transportation across Europe and the subsequent re-installation in the Netherlands.

This large and challenging project required the dismantling, transportation and re-installation of several furnaces, continuous casting lines and all the required auxiliary equipment such as transformers, cooling towers and pumps, needed in order to bring the plant back into full operation.

This complex international relocation required the Beck & Pollitzer Czech team to not only use extremely specialist access equipment and techniques but to execute the whole project whilst adhering to strict guidelines for working under Covid-19 additional hygiene requirements from both the Bulgarian and Dutch governments.

Challenge: A global leader in electrical and electronic safety components needed a reliable partner for the mechanical installation of a massive HOP 1000t press. Having successfully installed a previous press for the same client in 2019, Beck &amp…
Our client, a European automotive battery leader, sought to establish a state-of-the-art battery cell plant in France to decarbonise automotive battery production. They required a partner capable of handling the complex electrical integration and …
We are thrilled to announce that EcoVadis has assessed Beck & Pollitzer as being in the top 15% of companies worldwide for its social and environmental performance. This upgrade from Bronze to Silver, reflects our ongoing commitment to sustain…
In a recent project within the automotive and industrial manufacturing sector, a major relocation was successfully executed, involving the transfer of two critical fuel injection pump production lines. This intricate operation required the movemen…