Skip to main content

Latest News

Furnace installation


Beck & Pollitzer Russia completed the installation of a new furnace at the largest manufacturer of recyclable metal beverage and food containers.

Operating in Leningrad Region, Russia, our team disconnected the old furnace from utilities and dismantled the ventilation systems. The equipment was then removed from the workshop and the team installed the new furnace and ventilation systems, connecting them to the utilities.

During the production process, the base of the can is washed with a cleaning solution. The cans are then rinsed with distilled water and dried in the oven. To ensure the metal does not affect the taste of the can, several layers of food varnish are applied, as well as further drying if necessary.

The client expressed their deep gratitude to the Beck & Pollitzer team for their excellent performance during the new oven installation, highlighting ‘outstanding technical background’ and ‘perfect engineering skills.’

Successfully launching a new industrial facility requires more than just mechanical capability; it demands a global partner who can deliver seamless, end-to-end services, from heavy rigging to final commissioning. For a rapidly expanding metals lead…
Supporting the global energy transition demands manufacturing infrastructure that is engineered for absolute reliability, especially where extra-high-voltage (EHV) subsea cables are concerned. Beck & Pollitzer was selected by a leading global su…
In a major expansion of the American EV supply chain, Beck & Pollitzer recently completed a massive mechanical and electrical (M&E) installation project in Kansas, USA. Partnering with a global leader in advanced manufacturing and constructi…
2025 was a defining year for Beck & Pollitzer, marked by the successful delivery of complex industrial engineering projects across multiple continents, alongside measurable progress in sustainability, safety, and social impact. Our annual review…
Beck & Pollitzer Poland successfully executed a high-precision installation project for a Tier-1 food manufacturing client, involving the complex manoeuvring of large-scale production tanks. By deploying advanced rigging techniques and a special…